Engineering Building, Adelaide University
The New Engineering Building at Adelaide University has external columns which were clad in large format Donnybrook sandstone, some panels weighing up to 50kg each. Commercial Ceramics provided a secure fixing method to the external environment using Stoneclip stainless steel mechanical anchors fixed to a precast and steel frame. Ceramic tiling was also carried out to wet areas in the building.
BUILDER: Hindmarsh Construction
CLIENT: University of Adelaide
TYPE: External stone cladding and tiling to bathrooms
DETAILS: Donnybrook sandstone fixed with Stoneclip system / Ceramic tiles